AB - BDI - BL

Beam Loss detectors, wire scanners and gaseous detectors for the PS complex, SPS and LHC.

 

LHC equipment related links:

Valuable information from the CEIWG (Control Electronic Integration Working Group) (Updated 26/05/2004)

Lay-outs:

    Plans d'implantations des ouvrages souterrains (par P. Orlandi, mis à jour régulièrement)

    LHC database navigator, you need to install WHIP! to visualize drawings

    LHC layout documentation can be found in: Archived Insertion Region WG Minutes (updated on 04/12/2001)

    USA15 Lay-out (updated on 03/08/2004)

    SX4 Rack lay-out (updated on 04/06/2004) and pictures (updated 26/04/2004)

    UA43 Lay-out change for racks BY08-11 (updated 08/11/2004)

    LSS4: Engineering change order – Class I LHC Layout version 6.4  

    LSS4-left instrumentation lay-out (updated 04/03/2005)

Racks and cables:

    A summary of the AB/BDI rack and power needs in the LHC underground areas (by J. Koopman, *.xls, updated on 11/06/2003)

    Tableau récapitulatif des demandes de racks (par J.-C. Guillaume, mis à jour le 27/03/2003)

    Cable information concerning budget code 96547

    Some cable and connector price estimates

    Demande d'Instrallation de Cables (*.xls, par J.-C. Guillaume, mis à jour le 11/3/2002)

    Documents relatifs au DIC: Resumé du fonctionnement de la "Demande Installation Cables" (*.doc par J.-C. Guillaume, rev. septembre 1994)

    LHC cable assembly procedure

 
Number of hits: Hit Counter
Updated on 25/05/2005.
Send your comments and suggestions concerning this page to Jan Koopman.